Colfax County to be exact, and the array will include over 500,000 photovoltaic panels when it is finally operational and produce 30MW of solar electricity, reports MSNBC. Tri-State Generation and Transmission Association signed a contract with First Solar Inc to begin installing the system in April 2010.
SOLAR ENERGY IS THE RIGHT WAY TO GO THE RIGHT STUFF.
ReplyDeleteRewenable Energy
Soon will Power the World.
The Lord's Little Helper
Paul Felix Schott
This comment has been removed by the author.
ReplyDelete